Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 29 results ...

Abdalla, A (2007) Meeting housing needs in Libya: towards a responsive owner-built housing with particular reference to Benghazi City, Unpublished PhD Thesis, , University of Newcastle upon Tyne.

Agha, R H M (2016) The role of intelligent systems in traditional courtyard houses in Baghdad, Iraq, Unpublished PhD Thesis, , University of Newcastle upon Tyne.

Andam, K A (1979) Computer aided design of precast concrete industrial buildings, Unpublished PhD Thesis, , University of Newcastle upon Tyne.

Assadi, S O A (1997) An investigation of the records kept by supervisors on construction sites, Unpublished PhD Thesis, Department of Civil Engineering, University of Newcastle upon Tyne.

Beitelmal, J A (1999) Development of appropriate technology road condition monitoring system: Case study of the city of Benghazi in Libya, Unpublished PhD Thesis, Department of Civil Engineering, University of Newcastle upon Tyne.

Chen, Y (2008) Using mobile computing for construction site information management, Unpublished PhD Thesis, School of Architecture, Planning and Landscape, University of Newcastle upon Tyne.

Chritamara, S (2017) An application of the real option framework to large infrastructure projects: evidence for Thailand's transportation system, Unpublished PhD Thesis, Newcastle University Business School, University of Newcastle upon Tyne.

Das, P K (2006) A sustainability impact-assessment tool for selected building technologies in rural India: the case of the Andhra Pradesh primary education project, Unpublished PhD Thesis, , University of Newcastle upon Tyne.

Fieldson, R (2007) Towards a framework for sustainability in UK retail architecture, Unpublished PhD Thesis, , University of Newcastle upon Tyne.

Ghanbari Parsa, A R (1989) The interaction of planning policies and construction technologies in Iran with reference to China & Japan, Unpublished PhD Thesis, Department of Town & Country Planning, University of Newcastle upon Tyne.

Grifa, M A (2006) The construction industry in Libya , with particular reference to operations in Tripoli, Unpublished PhD Thesis, School of Architecture, Planning and Landscape, University of Newcastle upon Tyne.

Hatmoko, J U D (2008) The impact of supply chain management practice on construction project performance, Unpublished PhD Thesis, School of Civil Engineering and Geosciences, University of Newcastle upon Tyne.

Lopane, F D (2022) Spatial optimisation for resilient infrastructure services, Unpublished PhD Thesis, , University of Newcastle upon Tyne.

Mahdjoubi, L M (2001) An investigation of computer generated architectural representations on design decisions taks, Unpublished PhD Thesis, , University of Newcastle upon Tyne.

Mashamba, M S (1997) The construction industry in Zambia: opportunities and constraints under the structural adjustment programme and the enabling shelter strategy, Unpublished PhD Thesis, Department of Architecture, University of Newcastle upon Tyne.

McGinty, L N (2020) Business model innovation for green urban infrastructure, Unpublished PhD Thesis, , University of Newcastle Upon Tyne.

Muzir, A K K (2017) School buildings maintenance in Malaysia: Current practices, key challenges and implications, Unpublished PhD Thesis, , University of Newcastle upon Tyne.

Riano Cruz, J D (2022) Investigating formation of social capital benefits for value creation and strategy enhancement: the case of SMEs in the UK's construction industry, Unpublished PhD Thesis, , University of Newcastle upon Tyne.

Royapoor, M (2015) An investigation into the energy and control implications of adaptive comfort in a modern office building, Unpublished PhD Thesis, , University of Newcastle upon Tyne.

Salagoor, J Y (1990) The influence of building regulations on urban dwelling in Jeddah, Unpublished PhD Thesis, , University of Newcastle upon Tyne.

Scott, S (1991) Project plans and record-keeping on construction sites in the United Kingdom, Unpublished PhD Thesis, Department of Civil Engineering, University of Newcastle upon Tyne.

Shaaban, S M (2004) A user-centric approach for the development and evaluation of a visual interface to online information in the construction industry, Unpublished PhD Thesis, , University of Newcastle upon Tyne.

Shar, B K (2002) Application of it to improve the design process in the construction sector of Pakistan: A case of the specification management process, Unpublished PhD Thesis, , University of Newcastle upon Tyne.

Stoyell, J L (2004) Eco-design decision-making: towards sustainable engineering design of large made-to-order products, Unpublished PhD Thesis, School of Civil Engineering and Geosciences, University of Newcastle upon Tyne.

Sun, M (1993) Technology transfer, architectural design and integrated building design systems, Unpublished PhD Thesis, Department of Architecture, University of Newcastle upon Tyne.

Tangtinthai, N (2016) Extraction, use and disposal of construction materials in Great Britain and Thailand, Unpublished PhD Thesis, School of Civil Engineering and Geosciences, University of Newcastle upon Tyne.

Tarhuni, S M (2013) An investigation into the management of knowledge in a historic building conservation organisation in Tripoli, Libya, Unpublished PhD Thesis, , University of Newcastle upon Tyne.

Wiguna, I P A (2005) The influence of risk on project performance in Indonesian building contracts, Unpublished PhD Thesis, , University of Newcastle upon Tyne.

  • Type: Thesis
  • Keywords: building contract; decision making; inflation; payment; performance; contractor; owner; project manager; interview; probability; project performance; weather; Indonesia
  • ISBN/ISSN:
  • URL: https://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.424141
  • Abstract:
    Risks play a significant part in decision making and may affect the performance of a project. If they are not dealt with sensibly, they may cause cost overruns, delays on schedule and even poor quality. The main aims of this study were to collect information to allow the critical risks causing construction delay and cost overrun in building projects in Indonesia to be determined using a new risk assessment approach and to analyse the impacts of perceived project risk on project performance using a path model. Risk factors were identified through an intensive literature review and a total of 30 risk factors were identified and found to fall easily into four major categories. A preliminary questionnaire was designed and respondents in interviews conducted in Indonesia ranked the risk factors in order of their importance. The intention was to produce a manageable list of four critical risks in each category or sixteen risks across all categories. The sixteen risk factors were then used on a multi-project survey to calculate project risk indices. The main survey was predominantly based on interviews with project managers using structured and open-ended questionnaires. A total of 22 building projects under construction were surveyed. The respondents were asked to assess the probability that risks would occur and estimate the impact if the risks did occur using a five point scale. The project managers were also requested to assess the relative importance of each risk using pair-wise comparisons. From this information, a risk index for each project was calculated. It was found that the most critical risks affecting cost overrun and delay perceived by the building contractors were: high inflation/increased material price, design change by owner, defective design, weather conditions, delayed payments on contracts and defective construction work. A common theme amongst the critical risks identified appears to be that they cannot be controlled or managed by the contractors.

Williams, G A (1992) Contract as organisation: an economic analysis of the Joint Contracts Tribunal's Standard Form of Building contract 1980, Unpublished PhD Thesis, Faculty of Law, University of Newcastle upon Tyne.